Choke Bodies and Choke Beans for Oil and Gas

High-Performance Flow Control Components for Critical Pressure Management

Choke Bodies and Choke Beans Component Manufacturing

Chokes and choke beans are fundamental to controlling well pressure and regulating flow during drilling, completion, and production operations. Align Manufacturing supplies precision-machined choke bodies, housings, and choke beans to energy OEMs and equipment builders worldwide, ensuring durable, erosion-resistant flow control even under extreme operating conditions.
Our choke components are manufactured in trusted offshore facilities with rigorous quality oversight, providing Western-level manufacturing standards with supply chain transparency built in.

key features

Choke Components We Manufacture

  • Choke Bodies (Fixed and Adjustable)
  • Choke Bonnets and Housings
  • Positive Choke Beans
  • Adjustable Choke Stems
  • Seat Inserts and Retainers
  • Replaceable Wear Sleeves

All components are machined to customer prints or collaboratively reverse-engineered based on operating conditions.

Choke Beans: Flow Control You Can Trust
Choke beans are the heart of precision flow regulation. Align manufactures choke beans in a wide range of materials and bore sizes, delivering reliable performance in abrasive, high-pressure service.

Standard Sizes 1/8" to 2-1/2" flow bores
Material Options 410SS, 17-4PH SS, Inconel 718, Tungsten Carbide-lined
Pressure Ratings Up to 15,000 psi (API 6A standard)
Bore Finishes Honed and polished for extended wear life
Profile Options Positive beans, adjustable beans
Erosion Resistance Carbide inserts available for extreme sand service

Overview —

Applications for Choke Components
Align’s choke bodies and choke beans are used in:

  • Well Testing Skids
  • Flowback Manifolds
  • Choke and Kill Manifolds
  • Surface Wellheads and Trees
  • Offshore Production Systems
  • Frac Isolation Systems

Applications

Technical Capability Snapshot

Machining Tolerances ±0.0005" for sealing surfaces and bores
Surface Hardness Up to 68 HRC with tungsten carbide lining
Coating/Cladding Compatible with Xylan, PTFE, Inconel cladding
Compliance Full MTRs and batch documentation
Compliance API 6A, NACE MR0175, ISO 9001

Each choke component undergoes surface finish inspection, dimensional verification, and hardness testing to ensure it meets the demands of high-erosion, high-pressure service.

Choke Components in Manifold and Flowline Systems IMG

Choke Components in Manifold and Flowline Systems

Choke assemblies are critical elements within larger manifold systems, controlling flowback pressure during hydraulic fracturing, well testing, and production operations. Our choke bodies and beans integrate into manifold modules alongside plug valves, gate valves, and pressure fittings — providing a seamless fit and reliable service life.
By ensuring precision-machined tolerances and high-quality material sourcing, Align helps manifold builders and flowline OEMs extend uptime and reduce maintenance cycles.

Align MFG Choke Components

Why OEMs and Energy Equipment Providers Choose Align

  • Predictable quality from offshore production centers
  • Flexible batch sizes — prototyping to high-volume production
  • Material selection support for erosion and sour service
  • Dimensional consistency and full documentation
Why OEMs and Energy Equipment Providers Choose Align IMG

Overview —

Resources

In addition to our manufacturing capabilities, Align MFG plays a crucial role in optimizing supply chains. Our expertise in consolidating shipments, especially in regions like Vietnam, India, and Thailand , significantly reduces logistics costs and enhances efficiency, offering a reliable alternative to traditional sourcing from China. You can read more details about this below.

contact us —

ready
to discuss?

image-2

WE'RE A DEDICATED TEAM OF LOCAL PROFESSIONALS PASSIONATELY COMMITTED TO FUELING YOUR PROJECT'S SUCCESS. Our team is dedicated to maintaining a keen eye for detail in every aspect of the process, from design to delivery. Simultaneously, we prioritize clear, consistent communication with you to ensure that your vision and requirements are fully understood and met.